The roughest part of the construction project has begun. For the next two weekends, Aug 10-11 and Aug 17-18, the driveway between the church and the animal hospital will be closed. People in vehicles need to use extreme caution entering by way of the driveway between the rectory and convent. You can still park fairly close to the church. The parking lot exit will be by way of the driveway beside the carriage house onto Boyer Street. Signs are in place (as of end-of-day today) with these directions.
Help keep each other safe by carefully following this plan through the next two weekends.
The expectation is that we will be back to normal order by the weekend of Aug 24-25.
Stay healthy, my friends.
Peace,
Fr. Bill Grogan